The school includes a dedicated two-class gymnasium with full-size basketball court, and a separate commons/cafeteria in the center of the building. The school was designed to fit into an environmentally sensitive site with wetlands while still incorporating a geothermal well field. The school building was fully enclosed in December of 2024 and opened in time for the start of the 2025-2026 school year.